ADHI Accelerates Jabodebek LRT Completion


Jakarta - As the operational time of the integrated Light Rail Transit or LRT in Jakarta, Bogor, Depok, and Bekasi (Jabodebek LRT) approaches, PT Adhi Karya Tbk (ADHI) continues to ensure the completion of the final stages of construction and trial of the Jabodebek LRT.

"The Jabodebek LRT train series entered the Depo area for the first time on Tuesday (3/15/)," said ADHI Corporate Secretary Farid Budiyanto in a written statement released on Friday (3/18) in Jakarta.

A total of two series, which have been tested in 3 cross-services, have opened the door to enter the Jabodebek LRT Depot area.

Following testing on cross-service 3 (Cawang-East Bekasi), the two series entered the depot area via the Bekasi Timur station, which is located in the same area as the depot. Both series of trains will be parked on the north and south sides of the Stabling Building or the Transfer Track before proceeding to the Light Maintenance and Heavy Maintenance Build



Berita Populer


ASEANFLAG

Kategori Berita